1.
Lift the server. This task requires at least two people.
2.
Place the server on the guide rails and slide it into the cabinet. See (1) in
.
Figure 4-7
Installing the server
3.
When the two mounting ears of the server come into contact with the mounting bars on
the cabinet, tighten their captive screws to secure the server. See (2) in
.
Step 3
Connect power cables to the server and power on the server. Connect a network cable, a VGA
cable, or USB devices as required.
----End
4.5 Connecting External Cables
4.5.1 Cabling Overview
Basic Guidelines
To ensure optimal heat dissipation, do not block the air exhaust vents of PSUs.
l
Lay out and bind cables of different types (such as power and signal cables) separately.
Cables of the same type must be in the same direction. Route cables near each other in
crossover mode. Ensure that the distance between power cables and signal cables is
greater than or equal to 30 mm (1.18 in.) when you lay out the cables in parallel.
l
If you cannot identify cables according to the cable labels, attach an engineering label to
each cable.