Do not touch the edge connector on a DIMM with bare hands. Before inserting a DIMM,
ensure that the edge connector is not polluted.
Figure 5-73 Installing a DIMM
Step 10 Install the air duct. For details, see
Step 11 Install the chassis cover. For details, see
Step 12 Install the server. For details, see
5.4.3 Installing the Server on Guide Rails
Step 13 Connect the power cables. For details, see
Step 14 Power on the server. For details, see
.
Step 15 Log in to the iBMC WebUI, and check whether the new component is normal. For
TaiShan Rack Server iBMC User Guide
----End
5.17 FlexIO Card
NO TICE
This section uses the server with Kunpeng 920 7260, 5250, or 5230 processors as
an example to describe the internal structure of a server. The procedures for
removing and installing the FlexIO card are the same for the server configured
with Kunpeng 920 5220 or 3210 processors.
Removing a FlexIO Card
Step 1 Wear an ESD wrist strap. For details, see
.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
134