Huawei SUN2000P-450W-P Скачать руководство пользователя страница 3

33

3

Installing the Optimizer Cables

PV module

Rooftop

Optimizer

PV module

Frame mounting bracket

The front of the optimizer should be 

at least 10 mm away from the rear 

of the PV module. The frame 

mounting bracket should be at least 

20 mm away from the rooftop.

Installed on a PV Module Frame – Frame 

MountingBracket (Rear-mounted)

Do not press the optimizer 

mounting ear against the 

positioning pole of the frame 

mounting bracket.

Purchase the frame mounting 

bracket separately from 

Huawei.

Install the PV module after the 

optimizer is installed.

1. Connect the optimizer 

input power cables.

2. Connect the positive probe of the multimeter to the positive 

output terminal of the optimizer and the negative probe to 

the negative output terminal. Check the output voltage and 

resistance of a single optimizer.

PV module 

connection box

Resistance

Cause

Suggestions

0.9 kΩ ≤ R1 ≤ 1.1 kΩ The optimizer is normal.

N/A

R1 < 0.9 kΩ

If the probes of the 

multimeter are correctly 

connected, the optimizer is 

faulty.

Replace the optimizer.

1.1 kΩ < R1

The sunlight is weak.

The optimizer input is not 

connected.

The optimizer output is 

connected to the PV 

module output.

The optimizer is faulty.

1. Measure the resistance when the sunlight 

is sufficient.

2. Connect the optimizer input power cables.

3. Correct the optimizer cable connection.

Connect the optimizer input power cables 

to the output cables of the PV module.

4. If the resistance is still abnormal, replace 

the optimizer.

Frame mounting bracket

The voltage V1 is 0 V.

The resistance R1 is 1 kΩ
(

±

10%).

If the probes are reversely 

connected, the measured 

resistance is less than the 

resistance measured when the 

probes are correctly connected, 

which might be less than 0.9 kΩ.

Содержание SUN2000P-450W-P

Страница 1: ...oduct Overview Type II apparatus enhanced insulation Burn warning Electric shock warning Mountin g bracket 2 Install the optimizer based on the selected installation mode Properly plan the installation position of optimizers to ensure that the cables between the optimizer and the PV module and between adjacent optimizers can be properly connected and the maximum communication distance between the ...

Страница 2: ...hole has been reserved on the PV module frame Prepare the bolt assembly and nut by yourself Ensure that the bolt length meets the installation requirements of the PV module frame PV module Installed on a PV Module Frame Frame Mounting Bracket Front mounted Do not press the optimizer mounting ear against the positioning pole of the frame mounting bracket Purchase the frame mounting bracket separate...

Страница 3: ...the output voltage and resistance of a single optimizer PV module connection box Resistance Cause Suggestions 0 9 kΩ R1 1 1 kΩ The optimizer is normal N A R1 0 9 kΩ If the probes of the multimeter are correctly connected the optimizer is faulty Replace the optimizer 1 1 kΩ R1 The sunlight is weak The optimizer input is not connected The optimizer output is connected to the PV module output The opt...

Страница 4: ...t is weak 1 1 kΩ R1 The optimizer input is not connected 1 1 kΩ R1 The optimizer output is connected to the PV module output 1 1 kΩ R1 PV string PV string a If R is infinite an open circuit occurs in the PV string or the cables are connected to different PV strings Rectify the PV string open circuit fault and correctly group the PV string cables b If R4 is less than R3 A is the positive cable of t...

Страница 5: ...he optimizer status 5 Troubleshooting Optimizer status Status Description Green The optimizer is running properly Gray The optimizer is offline Check that the SN and location information are correct and search for the device again Red The optimizer is faulty Fault alarm Fault Alarm Cause Suggestions Input overvoltage The output voltage of the PV module exceeds the maximum input voltage of the opti...

Страница 6: ...re of this model If the DC connectors to be connected are not of the Staubli MC4 model the connector compatibility report and third party lab TUV VED or Bureau Veritas report from the DC connector manufacturer must be available Using incompatible DC connectors may result in serious consequences The resulting device damage is beyond the warranty scope Full configuration scenario For a single phase ...

Страница 7: ...regulations specified in this document and the solar inverter user manual Use insulated tools when installing the device For personal safety wear proper personal protective equipment PPE If an optimizer does not connect to any other device connect the OUT and OUT ports of the optimizer respectively to the IN and IN ports to protect the terminals from water It is recommended that the positive and n...

Страница 8: ...8 Huawei Technologies Co Ltd Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China solar huawei com ...

Отзывы: