background image

4

13.Reinstall the ground, fuse, AC and DC cables in sequence.
14.Reinstall the USB cable (only for the 4G model), or reinstall the WLAN cable (only for the WLAN 

model).

15.Reinstall the 10-pin signal terminal and 2-pin enable terminal.
16.Reinstall the maintenance compartment cover.

12.After cables are routed, install the upper mounting kit of the new power compartment onto the 

mounting bracket. Reinstall the four M6 screws to secure the power and maintenance 
compartments.

10. Remove the power compartment.

11.Install the lower mounting kit of the new 

power compartment onto the mounting 
bracket and route cables.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Industrial Base, Bantian, Longgang

Shenzhen, People's Republic of China

Postal code: 518129

www.huawei.com

Отзывы: