25
SmartLogger Networking Scenario
6.6
SmartLogger3000
For details, see the
PV Plants Connecting to Huawei Hosting Cloud Quick
Guide (Inv SmartLogg RS485 Networking)
. You can scan the
QR codes to obtain the documents.
If the solar inverter connects to batteries, set battery parameters.
Setting Battery Parameters
6.5
1. Log in to the
FusionSolar
app and choose
My
>
Device commissioning
. The
Device commissioning
screen (Refer to 7.1 Device Commissioning.) is
displayed.
2. Choose
Power adjustment
>
Battery control
and set
battery parameters, including
Charge from grid
,
Control mode
(
Fully fed to grid
,
TOU(Time-of-use)
,
Maximum self-consumption
), and so on.
1. Access
Device commissioning
.
Device Commissioning
7.1
Scenario 1: Your phone is not
connected to the Internet.
Scenario 2: Your phone is
connected to the Internet.
7
FAQ
When your phone is
connected to the
Internet,
Device
commissioning
is not
displayed after you tap
...
.