
SUN2000-(33KTL, 40KTL)-JP
User Manual
5 Electrical Connections (2-pin Spot-Check Terminal)
Issue 07 (2019-06-30)
Copyright © Huawei Technologies Co., Ltd.
40
Figure 5-3
Stripped length
Step 2
Insert the exposed core wires into the crimping area of the OT terminal and crimp them using
hydraulic pliers, as shown in
Figure 5-4
Crimping a cable
The cavity formed after the conductor crimp strip is crimped must wrap the core wires completely. The
core wires must contact the terminal closely.
Step 3
Remove the ground screws from the ground points.
Step 4
Secure the ground cable using the ground screw and tighten the screw to a torque of 5 N•m
using a security torx wrench.