SmartLogger1000
User Manual
8 Power Grid Scheduling
Issue 12 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
258
Figure 8-4
Dry contact remote control
A maximum of 16 levels are supported for the percentages.
"√" indicates a low level. When connecting to GND1, the four DI ports of the SmartLogger are
low-level ports. If not connected, the ports are high-level ports.
The status combination of DI1(GND1)–DI4(GND1) should differ from each other. Otherwise,
abnormal command parsing will occur.
If the actual input DI signal is inconsistent with that configured on the WebUI, the SmartLogger
controls the SUN2000 to work at full power and the
Abnormal Active Schedule
alarm is generated.
8.2.3 Percentage Fix Limitation
The SmartLogger provides simplified active power percentage configuration as well as power
control automation, that is, to automatically adjust the active power derating percentage in
different periods of the day.
If the maximum power output of the inverter needs to be controlled, set
Active power control
mode
to
Percentage fix limitation
.