7 Routing Cables
Fiber (LC)
• When optical modules are
preinstalled to boards before
delivery, ensure that optical
modules are properly installed
before connecting fibers to
boards.
• To facilitate the subsequent
maintenance, bundle the newly
routed optical fiber with the
originally routed optical fiber
firmly. Ensure that the height of
the bundled optical fibers is
lower than 55 mm.
≤ 30mm
15
To ODF
• When handling optical fibers, do not stand close to or look into the optical fiber outlet directly with
naked eyes.
• Lead the optical fiber through a corrugated pipe. The mouth of the corrugated pipe must be
wrapped with the adhesive tape. In the cabinet, the corrugated pipe should not be longer than 100
mm. In addition, the corrugated pipe is bound at the cabling aperture.
• The bending radius of the optical fiber routed on the 48-port P2P board is greater than or equal to
5 mm.
• The 48-port P2P board has 24 optical transceivers. 12 optical fibers for six optical transceivers are
bundled in a group. When bundling the optical fiber, lean the optical fiber towards the right side of
the board. Do not pile up the optical fibers on the board. This avoids oppression among optical
fibers. Use four fiber binding straps at even distance to bundle the optical fibers of each board.
7.7 Routing Optical Fibers (P2P Board)
Binding
position 1
(ports 0-11)
Binding
position 3
(ports 0-35)
Binding
position 4
(ports 0-47)
Binding
position 2
(ports 0-23)
Fiber
(
LC
)
Содержание SmartAX MA5800-X7
Страница 1: ...HUAWEI TECHNOLOGIES CO LTD SmartAX MA5800 X7 Quick Installation Guide Issue 04 Date 2016 08 24 ...
Страница 16: ...7 Routing Cables Network cable 7 5 Routing Network Cables TO the maintenance terminal or transmission unit 13 ...
Страница 17: ...7 Routing Cables 7 6 Routing Trunk Cables Trunk cable To DDF Flat head screwdriver Binding position 14 ...