RRU3832&RRU3632
Installation Guide
2 Installation Preparations
Issue 05 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3
2
Installation Preparations
About This Chapter
This chapter describes the reference documents, tools, and instruments that must be ready
before the installation. In addition, it specifies the skills and prerequisites that installation
engineers must have.
Before the installation, you must be familiar with reference documents.
You must prepare the following tools and instruments before the installation.
2.3 Skills and Requirements for Onsite Personnel
2.1 Reference Documents
Before the installation, you must be familiar with reference documents.
The following reference documents are required during RU installation:
RU3832&RU3632 Hardware Description
DBS3900 Installation Guide
OCB User Guide
OCB-01M User Guide
2.2 Tools and Instruments
You must prepare the following tools and instruments before the installation.
Hammer drill (a φ12 bit)
ESD gloves
Vacuum cleaner