background image

6. Installing and Aligning the AP Antenna 

1. Secure the mounting bracket to the 

corresponding position on the pole using a hose 
clamp. Secure the excess part of the hose clamp 
using cable ties. 
 

 
 
 
 
 
 
 
 
 

2. Insert the attachment plate behind the AP into 

the slot of the mounting bracket, and secure the 
AP to the mounting bracket using screws on the 
top of the attachment plate. 

Pole 

AP 

AP mounting 
bracket 

Outdoor cable 
tie 

AP grounding 
clip 

Connecting to the outdoor ground 

bar or tower (the antirust paint 

needs to be removed) 

Hose clamp 

AP mounting bracket 

Attachment plate  

3. Install AP grounding clips. 

7. Installing the AP 

1. Use a compass to secure the antenna to the pole based on the position and azimuth specified 

in the planning document. 

2. Loosen the screws on the front clamp plate of the upper support, adjust the position of the front 

clamp plate to the elevation angle specified in the network planning document, and then secure 

the clamp plate. 

Screws for securing the 

front clamp plate 

1. Before the installation, remove the rear clamp plate from 

one screw. 

2. When fastening the support, ensure that the screw nut is 

closely attached to the front clamp plate to prevent  rotation 
of the screw.  

Nut 

Rear clamp plate 

5. Checking the Items Before Climbing the Tower 

NOTICE 

RF cables 

Outdoor  
network cable 

Outdoor optical 

fiber (optional) 

P&E port 

Outdoor network 

cable (optional) 

COMBO(e) port 

RF port (H) 

RF port (V) 

GE(o) port 

RF port (V) 

RF port (H) 

8. Installing Cables 

Tools and Documents 

Components and Cables 

Auxiliary Materials 

AP (with two RF cables) 

AP antenna (with antenna support) 

AP grounding clip  

Outdoor shielded network cable  

Optical module and outdoor optical 
fiber (optional) 

Adjustable wrench 

Diagonal pliers 

M3 and M6 hex keys 

Compass, mobile 
phone 

Planning document 

Hose clamp 

Binding strap 

Waterproof tape 

ESD tape 

Elevation 
adjustment 
slide 

Front and rear 
adjustment 

Azimuth 
adjustment 

1. Adjust the azimuth of the AP antenna as follows: Loosen 

the fastening screws on the upper and lower supports, 
move the antenna horizontally leftwards and rightwards 
until the antenna's azimuth measured by the compass 
reaches the planned value, and then secure the fastening 
screws. 

2. Adjust the elevation of the AP antenna as follows: Loosen 

the fastening screws on the angle ruler on the upper 
support, slide the screw on the angle ruler until the scale 
on the angle ruler reaches the planned value (you can 
use a gradiometer to achieve better accuracy), and then 
secure the fastening screw. 

3.  Fine adjust the azimuth and elevation of the AP antenna. 

NOTICE 

This document takes a sector antenna  as an example of how to complete the quick installation, 

similar to a flat antenna. For details about how to install an antenna, refer to the installation guide 

of the vendor. 

NOTE 

Содержание RTN510

Страница 1: ...e top of the connector to the lower part of the connector is 30 mm Vertical pole Diameter range 48 to 114 mm 1 white and orange 2 orange 3 white and green 4 blue 5 white and blue 6 green 7 white and brown 8 brown 1 The outdoor network cable connector on the AP side does not need to be equipped with a protective cover 2 During crimping the metal shield layer of the outdoor network cable and the met...

Страница 2: ...Outdoor network cable Outdoor optical fiber optional P E port Outdoor network cable optional COMBO e port RF port H RF port V GE o port RF port V RF port H 8 Installing Cables a Tools and Documents Components and Cables Auxiliary Materials AP with two RF cables AP antenna with antenna support AP grounding clip Outdoor shielded network cable Optical module and outdoor optical fiber optional Adjusta...

Страница 3: ...m the tower body to the outdoor cable tray and ground it 1 m away from the outdoor cable tray 2 Ground the outdoor network cable 0 5 m to 1 m away from the equipment room or outdoor cabinet except in the following cases The AP is connected to equipment that can be installed outdoors such as PC500 or outdoor PI the distance between the tower and the outdoor cabinet equipment room is less than 5 m 3...

Страница 4: ...he DCN If APs are not deployed on the same site set this status to Enabled On The Server When APs are deployed on the same site only one AP is configured as Enabled On The Server and other APs are configured as Enabled On The Client When the DHCP server is enabled set this parameter based on the IP address of the sub interface created on the router for the DCN if the upper layer network is a Layer...

Отзывы: