3. Installing AP's Antenna Supports
Quick Reference Guide for
RTN510 AP Deployment
Product version: 02 (2018-07-30)
1. Preparing for Site Deployment
2. Checking the Installation Environment
4. Pre-installing RF Cables on the AP Side and Making Outdoor
Network Cables
Pole requirements:
1. Check the positions of screws on
the supports.
If the diameter of the pole is less than 78 mm,
the screws are routed from the front clamp plate
to the rear clamp plate through the inner hole.
Upper support
Lower support
M6 x 16 square-neck bolt
M8 x 20 hexagon bolt
Upper support
Lower support
2. Install the upper and lower supports.
Power supply requirements:
•
The power for PoE power supply devices such as the PI or PC500 is available.
•
The PI or PC500 has been installed at the site or together with the AP.
1. To facilitate installation, remove the PG connector and protective cover from the P&E
and COMBO(e) ports before installation.
2. When securing the RF port of the AP, expose a thread of about 3 mm (2 to 3 circles).
3. Apply waterproofing and anti-corrosion treatments on the two RF ports.
Expose 2 to 3
circles of
threads on the
connector.
Wrap one
layer of
insulation tape.
Wrap three layers
of waterproof tape.
Wrap three
layers of
insulation tape.
Wrap it with
binding straps on
both ends.
The height from
the top of the
connector to the
lower part of the
connector is
30 mm.
•
Vertical pole
•
Diameter range: 48 to 114 mm
1: white and
orange
2: orange
3: white and green
4: blue
5: white and blue
6: green
7: white and brown
8: brown
1. The outdoor network cable connector on the AP
side does not need to be equipped with a
protective cover.
2. During crimping, the metal shield layer of the
outdoor network cable and the metal shell of the
RJ45 connector must be in good contact.
3. After the outdoor network cable is prepared, check
the wire sequence and use a multimeter or a
network cable tester to test the connectivity.
NOTICE
NOTICE
Tools and Documents
Components and Cables
Auxiliary Materials
Adjustable wrench
Crimping tool, diagonal
pliers
M3 and M6 hex key
Smartphone on which the
MDT APP is installed,
compass
Planning document
Hose clamp
Binding strap
Waterproof tape
ESD tape
Network cable
grounding clip x 2
Scan the QR code for MDT APP
installation. The phone system version is
Android 4.0 or later, and the camera
resolution is greater than 8 megapixels.
1
2
MDT can be used for deployment only after being registered
and approved by Huawei.
The registration information must be consistent with the
information reported to Huawei for approval.
The value is
specified by
Huawei
engineers based
on the project.
a
AP
AP antenna
AP grounding clip
Outdoor shielded
network cable (made on site)
Optical module and outdoor optical fiber
(optional)
AP mounting bracket
AP antenna
installation support
RF cable x 2