30
Powering On the Equipment
Before powering on the equipment, ensure that
• The installation of the ODU, IF jumpers, and IF cables is complete.
• You are familiar with the precautions for handling power cables.
• The ODU power switches on the IDU of the RTN 905 2A/2E are turned off.
•
To power off the RTN 905 2F, you need to perform related operations on the NMS. By default, the RTN 905
2F is powered off on the NMS.
•
Under normal conditions, STAT, PWRA, and PWRB indicators are on (green). For description of indicator
states, see the
RTN 905 IDU Hardware Description
.
STAT
SRV
PWRA
PWRB