Figure 7-9
Hoisting power cables onto the tower
(1) Lifting sling
(2) Fixed pulley
1.
After climbing up to the tower, installation engineer A secures the fixed pulley to the tower
platform support and leads the lifting sling through the fixed pulley.
2.
Installation engineer B secures three cable ties to the power cable connector, and then
secures the power cable to the lifting sling, as shown in
.
NOTE
The connector on the power cable in the figure is only an example. The actual connector may vary
according to the situation.
RRU3268
Installation Guide
7 Hoisting an RRU and Related Cables onto a Tower
Issue ()
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
46