9
2. Loosen screws to remove the busbar cover.
3. Connect cables.
Power cable torque table for UPS2000-G-15 kVA or UPS2000-G-20 kVA (three-phase input
three-phase output)
Device
Tool
Screw
Torque
UPS2000-G-15 kVA
M5x0.8p
1.5 N·m
UPS2000-G-20 kVA
M5x0.8p
1.5 N·m
PDU
M5x0.8p
1.5 N·m
Torque
screwdriver
Cable list for the 1+1 parallel system of UPS2000-G-15 kVA or UPS2000-G-20 kVA (three-phase
input three-phase output)
1. The table lists only the cables directly connected to the PDU. For details about other cables
and cable types, see the quick installation guides for related devices.
2. Configure colors for the cables prepared onsite in accordance with the local regulations.
3. If customers purchase input and output power cables by themselves, use the cables that
comply with standards proposed by Underwriters Laboratories (UL) or International
Electrotechnical Commission (IEC).