Table 2-1 Engineering Responsibilities
Optical
Cable
Provider
Engineering
Party
Recommended
Solution
Remarks
Huawei
Huawei
Solution 1 is
preferred. If
solution 1 fails to
implement,
Huawei is required
to communicate
with the customer
about engineering
risks and sign a
memorandum with
the customer
before using
solution 2.
If solution 1 is used,
the engineering quality
must strictly comply
with engineering
specifications. If
solution 2 is used, the
network box must be
securely grounded. In
addition, a metal
protective cover must
be installed between
the fiber strength
member and network
box fixing points,
preventing sparks from
spreading if the fiber
strength member
connects to a heavy-
current power line.
Customer
Solution 1
If the engineering does
not comply with
solution 1, the
customer must take
consequences.
Customer
Huawei
Requirements:
During
engineering, do
not route the fiber
strength member
into the network
box. In addition,
ground the fiber
strength member
and the network
box separately.
Install the network
box and ONU
based on the
instructions
provided in this
document.
The customer must
ensure that the fiber
strength member is not
be routed inside the
network box.
Otherwise, the
customer must take
consequences.
a. Grounding solution 1: The fiber strength member is isolated from the
network box and grounded outside the network box.
Huawei OptiXstar P603E
Quick Start
2 Installing the Device
Issue 02 (2020-07-13)
Copyright © Huawei Technologies Co., Ltd.
8