background image

Installation Reference

1

Open

the cover  of the PI.

1

2

Loosen the screws on the cover and open the 
cover (4.8

±

0.48 N·M).

Remove the plugs in the cable holes that will hold cables.

Reserve  the plugs in the unused  cable  holes.

2

Install PI cables.

For  the peeling  sizes of  cables, see the 1:2 peeling 
indicator  on the PI.

Avoid  dropping  any metal scraps or other  miscellaneous 
objects on the front  panel  or  in any ports or cracks in the PI.

MGMT

P&E

(+)

(-)

(+)

(-)

1

2

3

4

Open  the covers  the power  ports.

Install the power  cables with OT 
terminals  to the power  ports. 
Ensure  that the positive  and 
negative  cables are correctly 
connected.

Tighten  the screws of  the OT  terminals.

Close  the covers  of  the power  ports.

Black (brown):  0 V

ground  cable

Blue: -48  V

Power 

supply 
device

Connected to one FE/GE 

(electrical) service

Wire clip

Connected to the P&E 

port of the equipment 

Wire clip

Peel a cable according to the 1:2 peeling indicator 
and expose the shield layer.

Loosen a wire clip.

Route the cable through the rubber ring and wire clip 
and fix  the cable in the waterproof cable trough.

Tighten the wire clip and ensure that the wire clip is 
completely pressed against the shield layer with no 
contact of the sheath. 

The shield layer is not 

exposed.

The peeling size is larger than the 1:2 peeling 

indicator and the exposed shield layer extends to 
the waterproof cable trough, which fails the 

waterproof function.

The cable is not fixed 

with a wire clip.

Shield layer 
of  a cable

The  shield  layers of  all PI cables must be  grounded  using wire  clips. Otherwise,  the cables may be 
damaged  by lightning  strikes.

1

2

3

4

02/03 >>

•If an 8-core P&E cable is used to 
connect an outdoor device to a PI, 
connect the P&E cable to the P&E 
port on the PI.
•If a 12-core P&E cable is used to 
connect an outdoor device to a PI, 
connect the 8-core connector of the 
cable to the P&E port on the PI and 
the 4-core connector of the cable to 
the MGMT  port on the PI.

05

Содержание OptiX RTN PI-DC B10

Страница 1: ...es of the PI correctly to the positive and negative terminals of the power supply device To prevent damage to power cables or devices caused by short circuits install a circuit breaker on the negative terminal of the power supply device Do not install or remove a live P E cable Issue 05 Date 2018 10 30 Huawei Technologies Co Ltd Address Huawei Industrial Base Bantian Longgang Shenzhen 518129 Peopl...

Страница 2: ...BGND 2 BGND 3 48 V power signal 4 BGND 5 BGND 6 48 V power signal 7 48 V power signal 8 48 V power signal Whether the P E ports use MDI or MDI X mode to transmit Ethernet service signals does not affect the pin assignments for power signals Pin assignments for power signals in the P E ports 02 1 2 3 5 6 7 8 9 10 4 11 12 13 Mounting ears Cover of the PI 1 P E cable PI side pin assignments of the P ...

Страница 3: ...uples GE signals and power signals butdoes notregenerate or strengthen GE signals Therefore the network cable between the UNI side device and the powered device mustnotbe longer than 100 m The maximum distance between the PI and the powered device varies depending on the power of the powered device For details see technical specifications Maximum distance between the PI and powered device CAUTION ...

Страница 4: ...CE certification Compliantwith IEC 60950 22 Compliantwith EN 60950 22 Item Description Major reference standards Operation Compliantwith ETSI EN 300 019 1 3 class3 2 Transportation Compliantwith ETSI EN 300 019 1 2 class2 3 Storage Compliantwith ETSI EN 300 019 1 1 class1 2 Operating temperature 33 C to 55 C Relative humidity 10 to 100 Earthquake resistance Compliant with ETSI 300 019 2 4 Altitude...

Страница 5: ...clip Peel a cable according to the 1 2 peeling indicator and expose the shield layer Loosen a wire clip Route the cable through the rubber ring and wire clip and fix the cable in the waterproofcable trough Tighten the wire clip and ensure that the wire clip is completelypressed againstthe shield layer with no contact of the sheath The shield layer is not exposed The peeling size is larger than the...

Страница 6: ... PI up to the w alland mark the drilling positions Drill the holes and insert the fixing bolts If multiple PIs need to be installed reserve a heat dissipation space of at least 50 mm around each PI 8 Drilling positions Drill Ф8 holes to a depth of 52 to 60 mm Mounting holes Mounting holes Install the PI on the wall b Hold the PI when you fix it on a wall The PI will drop off without enough support...

Страница 7: ...he PI when you fix it on a pole or a tower The PI will drop off withoutenough support Ensure that the service ports of the PI face downward before you fix the PI Install the PGND cable of the PI Connectthe OT terminal ofthe PGND cable to the ground nut PGND cable Remove the anticorrosion paintand oxide layer at the ground point After the connection is complete waterproofand rustproofthe ground poi...

Отзывы: