Precautions
Page 1
Tools for Installation
Introduction to the Chassis
Installing and Routing
Cables
Checking the Insatllation
Powering On the
Equipment
End
Start
Check Fiber Connection
Powering on the
Equipment
Preparation for
Installation
Installing the Chassis
Checking Cable
Connectivity
Common Cables for the
Chassis
Installing the Protection
Grounding Cable
(Mandatory)
Installing Power Cable
(Mandatory)
Installing the E1 Cable
Installing the Ethernet
Service Cable
Installing Fibers
Installing the NM
Cable
Page 2
Page 3
Pages
4-7
Pages
8-12
Page 14
Page 13
Page 15
Pages
16-17
Page 8
Pages
9-10
Page 10
Page 8
Page 16
Page 17
Expected Effect of
Installation in a 19-Inch
Cabinet
Installing the External
Clock/Time Cable
Page 11
Page 11
Page 12
Page 12
Installing the Chassis in a
19-Inch Cabinet
Page 4
Page 5
Installing the Chassis in an
ETSI Cabinet
Installing the Chassis in
an open rack
Page 6
Installing the Chassis
into the indoor mini box
mounted on the wall
Page 7
Installation Flow
Certain operations are
optiona
l
. Before performing an optional operation,
consult
with the engineering
supervisor or software debugging engineer to decide whether to perform the operation. The other
operations are
mandatory
.
After you finish the installation, send the information about the bar code to Huawei Headquarters
according to the Tabulation for the Feedback of Bar Codes of Equipment at Stations.