84
Phillips screwdriver
T32
9 Installing and Routing Subrack Power Cables
T32 Subrack
b
When power cables are preinstalled on the right side of a cabinet
1. When a T32 subrack needs to be installed on site, find the power
cables on the right side of the cabinet.
2. Install OT terminals of power cables and keep them vertical. Install all
associated covers after connecting all power and NM cables.
NOTE
Route the preinstalled power cables to the left and right sides of the T32 subrack.
Main power cables:
Route the cables from the right side to the left side of the subrack along the empty space
above the subrack.
Backup power cables:
Directly route the cables to the right side of the subrack.
Main
Backup
Cable tie
Diagonal pliers