Figure 4-31 Commissioning succeeded
●
is displayed if component commissioning fails, which ends
startup wizard commissioning.
Figure 4-32 Commissioning failed
NO TE
If commissioning fails, tap Commissioning failed. in
to view the details.
----End
4.7 (Optional) Power-Off
Context
In shutdown mode, the Shutdown button is green (unavailable) and the Start
button is gray (available).
Procedure
Step 1 Tap Shutdown on the home screen. A warning is displayed, indicating whether to
shut down the smart cooling product, as shown in
NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual