6.6 Startup
Context
Tap the Start or Shutdown buttons on the home screen to start or shut down the
smart cooling product.
●
If the device is powered on again after a power failure, the device
automatically restores to the original start/shutdown state before the power
failure.
●
Hardware ports are reserved on the controller to control the status of the
remote dry contacts or remote startup and shutdown signal. The status of the
remote dry contacts and remote start/shutdown signal is started by default.
●
Starting a unit over the screen or NMS is valid only when the status of remote
dry contacts or remote start/shutdown signal is Start.
Procedure
Step 1 Tap Start on the home screen of the controller.
●
If the screen shown in
is displayed, tap Yes. Indicating initial
startup, perform
for initial startup verification.
Figure 6-29 Initial startup
Figure 6-30 Password screen
●
If the screen shown in
is displayed, indicating not initial startup,
tap Yes to start the smart cooling product.
NetCol5000-A050 In-row Air Cooled Smart Cooling
Product
User Manual
6 Power-On Commissioning
Issue 08 (2021-09-17)
Copyright © Huawei Technologies Co., Ltd.
159