NetCol5000-A 42 kW Air Cooled In-row Precision Air
Conditioner
User Manual
4 Commissioning
Issue 01 (2017-07-27)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
119
Context
The startup wizard allows for commissioning of components such as the indoor fan, electric
heater, humidifier, condensate pump, and cooling system. It also supports component
automatic operation and automatic device checking, and can output commissioning report.
After you power on the air conditioner for the first time, the screen displays the
Wizard
Startup
screen. If the air conditioner is not started for the first time, choose
Maint
>
Wizard
Startup
to enter the
Wizard Startup
screen.
Tapping
No
or
Exit
, submission timeout, and system exception all result in commissioning
failures. Choose
Maint
>
Wizard Startup
to enter the
Wizard Startup
screen for new
commissioning.
Procedure
Step 1
On the home screen, choose
Maint
>
Wizard Startup
, as shown in
Figure 4-31
Startup wizard
For the initial startup wizard,
Last record
is in gray, indicating that the operation is not allowed.
For the non-initial startup wizard, choose
Last record
and you can view the last startup wizard
report.
Step 2
Tap
Yes
. The checking before startup screen is displayed, as shown in
If the remaining refrigerant is not charged, tap
No
. Complete refrigerant charging by referring
to
4.7 Charging the Remaining Refrigerant
, and then perform the wizard commissioning.
Содержание NetCol5000-A
Страница 264: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...
Страница 265: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...
Страница 266: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...
Страница 267: ...NetCol 5000 A 42 kW Air Cooled In row Precision Air Conditioner User Manual D Electrical Conceptual Diagram ...