iManager NetEco 6000
Device Installation and Commissioning Guide
4 Connecting Monitoring Cables to Devices
Issue 03 (2019-03-10)
Copyright © Huawei Technologies Co., Ltd.
59
4
Connecting Monitoring Cables to Devices
Cable connections specified in this document are based on the cable connection sequences
specified in
Preparing a Monitoring Cable
. Connect cables in required sequences by
referring to
Preparing a Monitoring Cable
to prevent device connection failures.
Unless otherwise specified, all network cables in this document are crossover cables.
4.1 Scenarios for Connecting the server
4.1.1 Server Port Description
Ports on the RH2288H V3 rear panel
The RH2288H V3 server applies to NetEco Lite.
The RH2288H V3, RH5885 V3, and 2288H V5 servers apply to NetEco Pro.
Figure 4-1
Ports on the RH2288H V3 rear panel