Step 5
Install the SMS modem driver.
To install the SMS modem driver, see the specifications delivered with the SMS modem.
You need to install the driver only when the installation of the driver is required in the specifications
delivered with the SMS modem.
----End
10.12.23 Connecting Monitoring Cables to a Lighting Control Box
Prerequisites
Monitoring cables required have been prepared.
Procedure
Step 1
Connect monitoring cables to a lighting control box, as shown in
The lighting control box is recommended to receive power from the lighting power
distribution box in the equipment room. If no lighting power distribution box is available, the
lighting control box can directly receive power from the PDU2000 at the rear of the cabinet.
Figure 10-59
Connecting power cables to a lighting control box
(1) Cable 04050188
(2) Terminal 14170203
(3) Cable 25030384
(4) Circuit breaker of the lighting power distribution box
1.
Connect one end of cable 04050188 to the power port on the lighting control box. Cut
off and strip the other end and connect it to cable 25030384 using terminal 14170203.
2.
Connect the other end of cable 25030384 to the circuit breaker of the lighting power
distribution box.
Step 2
Connect monitoring cables to the lighting control box, as described in