background image

A: 

Distance between the lower edge of the recess 

and the floor

B: 

Distance between the top of the support and 

the lower edge of the recess

C: 

Distance between the left of the support and 

the left edge of the recess 

  

Recessed wall mount scenario:

D: 

Recess depth

E: 

Recess width

F: 

Recess height

1620mm: 

Distance between the top 

of the support and the ground to 

ensure the optimal angle of view

Wall mount scenario:

Ø 12mm

90°

65mm

M8*60mm

×6

a

b

3

Fix the expansion bolts at the marked positions on the wall.

4

Tighten the screws using an electric screwdriver to secure the 

wall-mounting bracket.

When the bubble of the lev

el 

instrument is betw

een the 

two black lines, the br

acket is 

horizontal.

C: 492mm

E: 2153.6mm

Level instrument

D: 132mm

B: 874mm

The dashed line indic

ates the 

wall-embedded scenar

io.

 

A: 746mm

F:  1366mm

1620mm

Bracket dimensions: 

1170×210×30mm

Product dimensions

1953.6×1166×97.2mm

Содержание IdeaHub Board Edu

Страница 1: ...n be used only with the device in this package If a component is damaged missing or wet upon being removed from the box contact Huawei technical support 2 Different models differ slightly in appearance The appearances of the device and accessories in this document are for reference only 主 机 箱 Antennas 2 Instruction Declaration of Conformity Model IFP UG86E Display box OPS box optional OPS Display ...

Страница 2: ...mmer drill Measuring tape Pencil Hammer 2 Use a pencil or a level instrument to determine the installation position of the bracket and mark the screw holes 1 Install the device on a vertical load bearing solid wall or concrete wall with more than 20 cm thickness To install the device on other types of walls reinforce the walls and verify the feasibility before installation Verification method for r...

Страница 3: ...he ground to ensure the optimal angle of view Wall mount scenario Ø 12mm 90 65mm M8 60mm 6 a b 3 Fix the expansion bolts at the marked positions on the wall 4 Tighten the screws using an electric screwdriver to secure the wall mounting bracket When the bubble of the level instrument is between the two black lines the bracket is horizontal C 492mm E 2153 6mm Level instrument D 132mm B 874mm The das...

Страница 4: ...e display Before installing or uninstalling the OPS ensure that the display is powered off Otherwise the OPS may be abnormal Different OPS models differ slightly in appearance and screw positions but the installation method is the same This document uses one OPS model as an example Remove the OPS cover a b Insert the OPS with its fan installed outwards When installing the display place the display...

Страница 5: ... long period of time keep the screen facing up for about 10 seconds and check whether the error is fixed 3 After the installation ensure that the screen is perpendicular to the ground and not at an angle to avoid exceptions Powering On the Device After the power supply is connected set the power switch of the display to ON When transporting a device from a low temperature area to a high temperature...

Страница 6: ... the network Netwok port USB flash drive Configuring the Device 4 Upon first power on of the device follow instructions on the touchscreen UI to configure the device By default no password is required for accessing the Advanced screen After the endpoint is started for the first time or restored to factory settings choose Settings Advanced Admin Password in the lower right corner of the home page on th...

Страница 7: ...ct to the Waste from Electrical and Electronic Equipment WEEE Directive of the European Union The purpose for separating WEEE and batteries from other waste is to minimize any environmental impact and health hazards due to the presence of hazardous substances Reduction of Hazardous Substances This device is compliant with the EU Registration Evaluation Authorization and Restriction of Chemicals RE...

Отзывы: