background image

1

Issue: 03
Date: 2018-06-20

PowerCube 500 V200R001C00 Quick Guide (ICC50)

Copyright © Huawei Technologies Co., Ltd. 2018. All rights reserved.

1

Product Overview

ICC Interior

PV module

PV module 

support

Dome 

camera

ICC50

Barrel 

camera

Pole

Lightning rod

Cantilever

PoE

Space for transmission equipment

Network port SPD

Space for a PDU

Space for an inverter

DCDU-80A1

Space for ESMU

Space for batteries

Heater

Barrel 

camera 

cable

Dome 

camera 

cable

ICC ground 

cable

Mains AC cable, 
optical fiber, ICC 
ground cable, 
camera cable, 
CPE cable, and 
PV module cable

CPE cable and PV 

module cable

Dome 

camera

ICC50

Barrel 

camera

Support

Pole (a cabinet 
can be installed on 
the pole with BOM 
number 21540285) 

Lightning rod

Cantilever

CPE

Solar+Mains Scenario

Mains Scenario

Cable Holes on the Pole

CPE

Содержание ICC50

Страница 1: ...pment Network port SPD Space for a PDU Space for an inverter DCDU 80A1 Space for ESMU Space for batteries Heater Barrel camera cable Dome camera cable ICC ground cable Mains AC cable optical fiber ICC ground cable camera cable CPE cable and PV module cable CPE cable and PV module cable Dome camera ICC50 Barrel camera Support Pole a cabinet can be installed on the pole with BOM number 21540285 Ligh...

Страница 2: ... signal cable DC cable and hydrogen discharge tube Reserved AC cable optical fiber PV DC cable and signal cable Cable Holes on the Partition Plate DC cable Ground cable Signal cable Optical fiber PV DC cable Signal cable AC cable E label cable ESMU battery signal cable ...

Страница 3: ...outh In the southern hemisphere PV modules face north 1 Remove the connective kit 2 Adjust the PV module direction based on the PV module direction principles and then install the connective kit 3 Adjust the PV module tilt angle based on the site latitude and secure the PV module support base Site Latitude Degree PV Module Tilt Angle 0 15 15 16 25 25 26 30 35 31 45 45 When installing beams keep th...

Страница 4: ...alling Four PV Modules Installing PV Modules 5 2 Adhesive tape 1 Install PV modules 2 Install cables for the PV modules Adhesive tape 1 Install vertical beams 2 Install supports 3 Install PV modules 4 Install cables for the PV modules ...

Страница 5: ... to hoist the pole to the foundation 8 Installing the ICC 1 Mark the mounting holes on the concrete floor and then install the expansion bolts 2 Secure the cabinet Nearest ground point Tool Pole BOM Number Torque 21540161 21540155 M18 215 N m 21540285 21540068 21540078 M24 500 N m 21540069 M30 3000 N m Adjust the tilting angle of the lightning rod according to the site latitude Site Latitude Degre...

Страница 6: ... slots support the installation of the R4850G2 and R4850N6 The PSU S4820G and M48300N1 are installed in the same way The right figure shows how to install a PSU Installing a Router and Cables 9 2 1 Take out the tray 2 Install a router When installing the AR550C AR550 AR531 MA5621 and MA5671 take out the small tray When installing the NE05E SK take out the big tray MA5621 Router 3 Reinstall the tra...

Страница 7: ...otective device SPD is configured when installing the signal cable for the router route the signal cable through the port on the network port SPD and then to the port on the router When installing the NE05E SK router remove the small tray and install the NE05E SK on the big tray NOTE NOTE Installing an Inverter a PDU and Cables 9 4 1 Install the inverter and power distribution unit PDU 2 Install t...

Страница 8: ... the documents delivered with the equipment 2 Install CPE cables The router is optional Installing CPE Cables NOTE For details about how to prepare the CPE power cable connector see the appendix Installing Camera Cables 9 7 1 Install camera signal cables 2 Optional Install alarm linkage cables for the dome camera 3 Install camera power cables Dome camera Camera power port Nearest cabinet ground po...

Страница 9: ...e two inner batteries and reinstall the battery baffle bars Install the negative battery cable before installing the positive battery cable 4 Install the two outer batteries and reinstall the battery baffle bars 5 Install battery cables NOTICE Installing the TCB 100C FCB 100B and Cables 1 Remove the battery baffle bars 2 Install batteries and reinstall the baffle bars 3 Install copper bars between...

Страница 10: ...SMU and ESU A 2 Set the ESMU address using the DIP switch and CAN DIP switch 5 Install a hydrogen discharge tube Routing the hydrogen discharge tube out of the cabinet COM2 COM_IN COM_OUT COM_IN COM_ELU COM_ELU IN 3 Install the ESMU signal cables 4 Install signal cables between the ESU As and ESMUs 5 Install ESMU power cables 6 Install the negative ESU A power cables ...

Страница 11: ...1 ESM 4875A1 10 3 1 Install ESM 4850A1 ESM 4875A1 2 Install a battery ground cable COM2 COM_IN COM_OUT COM_IN 3 Install the ESM signal cables TO the nearest ground blot TO the nearest ground blot 4 Install the ESM power cables The other end of the power cables are connected before delivery NOTE ...

Страница 12: ...again Solar Scenario Lead Acid Battery 1 Use a multimeter to measure the voltages at both battery terminals and ensure that the values are in the range of 43 2 V DC to 56 4 V DC 2 Switch the battery circuit breakers to ON 3 Insert the PV input connector into the SSU to connect the solar power supply Mains Scenario Lithium Battery Solar Mains Scenario Lithium Battery 1 Use a multimeter to check tha...

Страница 13: ...Set an IP address for the active NetEco server NetEco Backup IP 192 168 0 10 Set an IP address for the standby NetEco server NetEco Port Number 31220 Please contact Huawei technical support if you need change the port number Battery Basic Parameters Rated Capacity 100 Ah Set the parameter based on the actual battery capacity Other Parameters Installation Time Set this parameter to the current time...

Страница 14: ... Input Cable Connector 1 Prepare a DC output power cable and connector for the PV module 2 Measure the length of the cable to be stripped based on the terminal scale and then strip the cable to expose the conducting wires 3 Push the sliding cover of the EPC5 connector to expose two screws and loosen the two screws 4 Insert the blue wire labeled NEG into the port and black or brown wire labeled RTN...

Отзывы: