FusionModule800 Smart Small Data Center
Maintenance Guide
5 Parts Replacement
Issue 02 (2016-11-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
95
Figure 5-51
Position 2 for installing the smart ETH gateway
(1) Smart ETH gateway
Procedure
Step 1
Label each cable based on the corresponding ports on the smart ETH gateway.
Step 2
Disconnect cables from the smart ETH gateway.
Step 3
Remove the faulty smart ETH gateway from the guide rail, as shown in