FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
4 Cable Routing
Issue 10 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
222
Figure 4-38
Ports on the VCN
(1) Ground point
(2) GE2 port
(3) Power switch
(4) Power input port
(5) GE1 port
The figure uses the VCN500 as an example.
Step 3
Connect one end of the power cable to the power input port (as shown by (4) in
on the power module and the other end to the PDU2000 in the cabinet.
After connecting the power cable, turn on the power switch on the panel to start the device.
----End
4.6.4 Connecting a Monitoring Cable to the Smart ETH Gateway
Prerequisites
The smart ETH gateway has been installed.
Context