FusionDC1000A40 Prefabricated All-in-One Data

Center

Quick Guide (2021, Zambia, ZESCO)

Issue

01

Date

2021-06-18

HUAWEI TECHNOLOGIES CO., LTD.

Содержание FusionDC1000A40

Страница 1: ...FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO Issue 01 Date 2021 06 18 HUAWEI TECHNOLOGIES CO LTD ...

Страница 2: ...cribed in this document may not be within the purchase scope or the usage scope Unless otherwise specified in the contract all statements information and recommendations in this document are provided AS IS without warranties guarantees or representations of any kind either express or implied The information in this document is subject to change without notice Every effort has been made in the prep...

Страница 3: ... support engineers System engineers Commissioning engineers Data configuration engineers Symbol Conventions The symbols that may be found in this document are defined as follows Symbol Item Indicates a hazard with a high level of risk which if not avoided will result in death or serious injury Indicates a hazard with a medium level of risk which if not avoided could result in death or serious inju...

Страница 4: ...e main text NOTE is used to address information not related to personal injury equipment damage and environment deterioration Change History Changes between document issues are cumulative The latest document issue contains all updates made in previous issues Issue 01 2021 06 18 This issue is the first official release FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZES...

Страница 5: ...wings 3 3 Removing Transport Protection Materials 4 4 Initial Configuration Parameters 5 A Common Torque Selection Table 6 FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO Contents Issue 01 2021 06 18 Copyright Huawei Technologies Co Ltd iv ...

Страница 6: ...i technical support Huawei shall not be responsible for any loss caused by unauthorized configuration modification You can modify initial configurations under the guidance of Huawei engineers Huawei assumes no liability for any loss caused by unauthorized changes to the initial configurations Some parameters mentioned in this document should be provided and configured by onsite technical support e...

Страница 7: ...e data center in use type of power grid used by the customer and internal configuration of each pre fab module When performing operations such as installing an awning or outdoor unit over the top of a pre fab module take measures to protect the top of the pre fab module against damage Do not perform operations such as arc welding drilling and cutting on the top of a pre fab module FusionDC1000A40 ...

Страница 8: ...2Installation Drawings FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO 2 Installation Drawings Issue 01 2021 06 18 Copyright Huawei Technologies Co Ltd 3 ...

Страница 9: ...Air Conditioners and LCD Embedded Pieces Installing Air Conditioners and LCD Embedded Pieces NO S005 Air Conditioner and LCD Embedded Piece Installation Position Diagram Installing Suspended Ceilings Installing Suspended Ceiling Aluminum Clip in Panels Installing Suspended Ceiling Aluminum Clip in Panels NO S006 Suspended Ceiling Aluminum Clip in Panel Installation Position Diagram Installing Glas...

Страница 10: ...roundwork reinforcing steel bars select the inner hole instead 3 During installation ensure that the direction of the single capacity base is the same as the drawing 4 Reserve two cable outlets for power cables at the shown positions on the ground It is recommended that the cable outlets be made of steel pipes or PVC pipes with an inner diameter of not less than Ø100 mm and a reserved height of 50...

Страница 11: ...e figure above The ground points are connected with the ground grid Before grounding remove the aluminum foil from the ground points The ground bolts are M12 30 stainless steel hexagon bolts with a torque of 60 N m Item Drawing No Quantity Unit Ground screw GB5783 2000_M12X30_S_ZNALL 4 PCS 540 540 540 540 176 7 1 026 1 026 176 7 No S002 Pre fab Module Grounding Position Diagram ...

Страница 12: ...B5783 2000_M16X40_S_ ZNAL 9 PCS Note 1 The eaves are secured on the pre fab module using 3 PCS of GB5783 2000_M16X40_S_ZNAL screws with a torque of 40 N m as shown in the figure Eave 1 Eave 2 Eave component Rubber strip GB5783 2000_M16X40_S_ZNAL No S003 Eave Installation Position Diagram ...

Страница 13: ...Electric cable outlet M50 38 ELV signal cable outlet M50 38 4 657 5 840 1 042 5 1 470 No S004 Electric Cable and ELV Signal Cable Outlet Position Diagram ...

Страница 14: ...e 2 410 280 1 200 619 619 Floor inside the pre fab module Glass window Embedded piece Embedded pieces Front wall Rear wall Air conditioner drainage port Air conditioner drainage port 88 9 No S005 Air Conditioner and LCD Embedded Piece Installation Position Diagram ...

Страница 15: ...ghting 10 600 100 600 Front wall Rear wall Aluminum top plate diagramⅠ 156 1 800 11400 Hanging rod Hanger U50 main keel Aluminum top plate Triangular keel Hook Connection nut Aluminum plate and keel connection III Aluminum ceiling edge strip near the wall Hanging rod Bracket L shaped slot color steel sheet Aluminum plate Fastening Keel hanger U shaped main keel Embedded keel Aluminum clip in panel...

Страница 16: ...nt 5 30 Edge steel sheet 22 5 9A 5 hollow glass M8 80 nylon expansion bolt 40 20 1 5 galvanized steel square tube Corner connector Glazing bead 27 5 9 5 8 After all windows are installed install the glass bead and apply the glass cement The glass window packaging components include all the materials Indoor Outdoor No S007 Glass Window Installation Position Diagram ...

Страница 17: ...1 IE Socket 2 IE Socket 3 IE Socket 4 IE Socket 5 DDF 1 DDF 2 DDF 3 DDF 4 DDF 5 DDF 6 DDF 7 DDF 8 Note The customer provides network cables to connect to the network port connector on the signal cable feeder window No M003 Monitoring Onsite Wiring Diagram ...

Страница 18: ...n 3 Air inlet window A C A C A C A C 1 Fan Switch 1 Power Signal Feeder Window Cable Relation Table Terminal Relation Table Cable No INPUT OUTPUT Breaker Power System Huawei Part Description Terminal Spec From Part 1 Terminal Spec From Part 2 Container From Device Container To Device C1 C2 customer Input Lighting PDB 1 QF L Provide by customer Electronic Electric Cable 600V 1000V ZA YJV22 3x6mm 2 ...

Страница 19: ...ection Materials to Be Removed 1 Smart cooling product Transport fastener 2 Light Securing tape 3 Emergency light Securing tape 4 Camera Securing tape 5 Emergency door release button Plastic cover FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO 3 Removing Transport Protection Materials Issue 01 2021 06 18 Copyright Huawei Technologies Co Ltd 4 ...

Страница 20: ...tial Configuration Parameters FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO 4 Initial Configuration Parameters Issue 01 2021 06 18 Copyright Huawei Technologies Co Ltd 5 ...

Страница 21: ...oling System Air Cooled NO C001 Cooling Device Layout Diagram N A Initial Configurations for the Management System NO M001 Monitoring Device Layout Diagram N A Initial Configurations for the Fire Extinguishing System NO F001 Fire Extinguishing Device Layout Diagram CE N A Other Systems NO F003 Emergency Exit Diagram N A Initial Configurations for the Power Supply and Distribution System List of In...

Страница 22: ...0A Socket 13 WY 10A 1 Lighting Switch 1 1 Lighting Switch Socket Lighting 1 Lighting 2 Lighting Lighting PDB 1 Lighting PDB 2 Lighting 3 Lighting 4 Lighting 5 Lighting 6 Lighting 7 Lighting 8 Lighting 11 Lighting 12 Socket 14 Air Conditioner WY 10A Lighting 9 Lighting 10 Fan 2 Fan 1 Fan 3 Air inlet window A C A C A C A C 1 Fan Switch 1 Power Signal Feeder Window 1 Fan Switch No P001 Power Supply a...

Страница 23: ...et 14 Air Conditioner Spare Lighting PDB 1 Lighting Switch 1 Lighting 1 14 Spare Spare Customer Input 32A 1P RCD 16A 1P MCB QF QF1 16A 1P MCB QF2 QF3 QF4 QF5 QF6 QF7 QF8 10A 1P MCB 10A 1P MCB 10A 1P MCB 10A 1P MCB 10A 1P MCB QF9 10A 1P MCB 10A 1P MCB YO AUX Socket 12 Socket 6 7 Socket 4 5 Socket 13 Spare Lighting PDB 2 Socket 2 3 Socket 10 11 Socket 8 9 Customer Input Spare No P002 Power Supply an...

Страница 24: ...1000mm 1000mm 1000mm 1000mm Fan 2 Fan 1 Fan 3 Air inlet window A C A C A C A C No C001 Cooling Device Layout Diagram ...

Страница 25: ...A C A C A C A C Power Signal Feeder Window IE Socket 1 IE Socket 2 IE Socket 3 IE Socket 4 IE Socket 5 DDF 1 DDF 2 DDF 3 DDF 4 DDF 5 DDF 6 DDF 7 DDF 8 No M001 Monitoring Device Layout Diagram ...

Страница 26: ...A C A C A C A C Power Signal Feeder Window EXIT Exit 1 Emergency Lighting 2 Emergency Lighting Emergency Lighting 1 Emergency Lighting No F001 Fire Extinguishing Device Layout Diagram CE ...

Страница 27: ...A C A C A C A C Power Signal Feeder Window No F003 Emergency Exit Diagram ...

Страница 28: ...Referenc e Structura l Connecti on Commo n Steel Connecto r Electrical Connection OT DT Terminal Cord End Terminal Block Positive Negative Battery Wiring Terminal M3 Cross recessed small pan head screw assembly Electric screwdriv er 6 6 M4 Cross recessed counters unk head screw cross recessed pan head screw assembly Electric screwdriv er 12 12 14 FusionDC1000A40 Prefabricated All in One Data Cente...

Страница 29: ...rewdriv er 30 50 30 50 M8 Cross recessed hexagon head screw assembly Torque wrench 200 130 Cross recessed counters unk head screw Pneumati c screwdriv er 80 M10 Hexagon head screw assembly Torque wrench 400 270 M12 Hexagon head screw assembly Torque wrench 600 470 M16 Common bolt Torque wrench 1600 1200 FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO A Common Tor...

Страница 30: ...n flange self drilling tapping screw Pneumati c screwdriv er 50 for checking not for tightenin g G1 2 1 2 pipe connecto r Torque wrench 350 G3 4 3 4 pipe connecto r Torque wrench 600 G1 1 pipe connecto r Torque wrench 600 FusionDC1000A40 Prefabricated All in One Data Center Quick Guide 2021 Zambia ZESCO A Common Torque Selection Table Issue 01 2021 06 18 Copyright Huawei Technologies Co Ltd 8 ...