5
4. Connect one end of the battery cable to
battery wiring ter, N, and
– in the
UPS cabinet.
1. Remove the cover from the power
distribution subrack.
2. Remove the big cover from the cabinet
bottom, drill holes based on site
conditions, and reinstall the big cover in
the cabinet.
3. Connect the ground cable.
5. Connect the other end of the battery cable
to ter, N, and
– in the battery
cabinet.
Connecting Cables
3.2