
IPE
Installation Guide
7 Installing a Day & Night High Speed Do me IPC
Issue 03 (2013-02-28)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
76
Figure 7-13
Cutting a hole on the suspended ceiling
Suspended ceiling
Hole with a diameter of 240mm
Step 5
Put the high-speed dome IPC and the embedded bracket in the middle of the hole on the
suspended ceiling, and lock the three retainers, as shown in Figure 7-14.
Figure 7-14
Fixing the bracket onto the suspended ceiling
NOTE
Use a screwdriver to fasten the screws and the retainers will automatically turn outward and press tightly
against the ceiling. In this way, the bracket is fixed onto the ceiling.
Step 6
Mount the plastic decorative cover onto the main body of the IPC. Rotate the cover clockwise
to fix it onto the bracket, as shown in Figure 7-15.
Figure 7-15
Installing the plastic decorative cover
----End