background image

Preparation for Installation 

Notice 

This document describes how to install the server, how to connect the power cables and signal cables, and 
how to check the connections when the Huawei RH2288H V3, and RH5885H V3 server act as the server of 
eSight. 

 

The power cable connection and signal cable connection that are detailed in this document are written 
according to the standard configuration. If the actual on-site installation requirements are inconsistent with this 
document, handle the requirements according to the actual situation. Unless otherwise specified, the models of 
the corresponding floating nuts and panel screws are M6.  
 
All figures in this manual are for reference only and may differ from actual devices which prevail.  
This document does not describe the installation of the cabinet. For details on the cabinet installation, refer to 
the installation guide of the cabinet.

 

 
 

Before installing devices in the cabinet, take appropriate antistatic measures to prevent any electrostatic discharge of the 
human body from damaging sensitive components.  

Do not install or remove a live power cable. Before installing or removing the power cable, turn off the power switch. 

Server Specifications and Installation Requirements 

•   Cabinets are 19-inch-wide and 39.37-inch-deep and comply with International Electrotechnical Commission 
(IEC) 297 standards. 
•   A space of at least 800 mm be reserved in front of and at the back of each cabinet respectively to facilitate 
ventilation and maintenance.

 

The following table lists the basic server specifications. For details about server specifications, see the server 
specifications delivered with devices. 

The preceding servers can be installed in the following cabinets: 

 

To ensure a low center of gravity and high stability, install servers in the lower part of a cabinet. 

Server 

Dimensions 

 (H x W x D) (mm) 

Weight (kg) 

Input voltage (V)  

Rated Power (W) 

RH2288H V3 

86.1 (2U) x 447 x 708 

27 

100 V AC to 240 V AC 

2 x 460 

RH5885H V3 

175 (4U) x 447 x 790 

62 

100 V AC to 240 V AC 

2 x 2000 

–48 V DC to –60 V DC 

2 x 2500 

Содержание eSight V300R005C00

Страница 1: ...HUAWEI TECHNOLOGIES Co Ltd eSight V300R005C00 Hardware Installation Guide Issue 01 Date 2015 12 30 ...

Страница 2: ...ion for Installation Installing the Server Installing the Power Cables Installing the Signal Cables Checking the Installation Powering On Off the Server End Start Page 2 to 3 Page 4 to 5 Page 6 to 7 Page 8 to 12 Page 13 Page 14 2015 ...

Страница 3: ...the cabinet take appropriate antistatic measures to prevent any electrostatic discharge of the human body from damaging sensitive components Do not install or remove a live power cable Before installing or removing the power cable turn off the power switch Server Specifications and Installation Requirements 2 Cabinets are 19 inch wide and 39 37 inch deep and comply with International Electrotechni...

Страница 4: ...r Flat head Screwdriver Mount Bar Tie Wrap Wire Stripper Diagonal Pliers RJ45 Crimping Tool Multimeter Network Cable Tester ESD Gloves ESD Wrist Strap The tools for installation are not delivered along with the device Please provide for yourself ...

Страница 5: ...e installation M3 M6 Phillips screwdriver Electrostatic discharge ESD gloves Install adjustable guide rails by referring to the installation guide At least two persons lift the server on two sides and move it to the cabinet Place the server on the guide rails and push it in to the cabinet The server is heavy and two or three persons are required to carry the PC server If disks are removed before t...

Страница 6: ...e rails can only be used in a Huawei cabinet L shaped guide rails are delivered with Huawei racks No L shaped guide rails are delivered with the server Install floating nuts Install L shaped guide rails Floating nuts provide tapped holes for the M6 screws used to secure a server At least two persons lift the server on two sides and move it to the cabinet Place the server on the guide rails and pus...

Страница 7: ... and personnel use the matching power cables Connect the one end of the AC power cable to the power port on the PSU of server Insert the other end of the AC power cable into the AC power socket on the rack The AC power socket is horizontally secured on the rear of the rack Select the jacks on the nearest socket for connection based on the installation plan Bind the power cable to the cable trough ...

Страница 8: ...s screwdriver to loosen the screw on the ground bar in the rack and connect the other end of the ground cable to the removed screw You are advised to choose the screw nearest to the server Install the screw in the ground bar and tighten the screw Connect the OT terminal of the negative electrode to the terminal NEG of the PSU and connect the OT terminal of the positive electrode to the terminal RT...

Страница 9: ...f the pictures are different from the delivered devices take the delivered devices as the standard For details about the devices see the associated manuals delivered with the devices RH5885H V3 server rear view Number Port Description 1 GE port Connects the service network 2 Mgmt management network port Connects the maintenance network 3 VGA port Connects a display 4 USB Port Connects the mouse ke...

Страница 10: ...onnect network ports of the server to the switch based on the actual networking In a single node system connect at least one network port To remotely manage the server connect the Mgmt management port of the server to the switch RH2288H V3 RH5885H V3 ...

Страница 11: ...e line Network ports 2 and 4 can be bonded as the heartbeat or duplication private line If multi subnet management is enabled bond network ports 5 and 6 as the second application private line The heartbeat and duplication private lines between active and standby servers are directly connected and must be Category 5e cables less than 60m To remotely manage the server connect the Mgmt management por...

Страница 12: ...rts Network ports 1 and 3 can be bonded as the system or application private line Network ports 2 and 4 can be bonded as the heartbeat or duplication private line If multi subnet management is enabled bond network ports 5 and 6 as the second application private line To remotely manage the server connect the Mgmt management port of the server to the maintenance network RH2288H V3 RH5885H V3 ...

Страница 13: ... Cables 5 a Lay network cables inside the cabinet b Lay network cables underground between cabinets c Lay network cables overhead between cabinet Bundle network cables at 20 cm intervals to tidy up cables in the cabinet ...

Страница 14: ...bound separately from other cables 11 Labels are attached at both ends of the power cables and the PGND cables 2 No Item 1 There are no solder joints or connectors in the signal cables The signal cables are not scratched or broken 2 The connectors of the signal cables are tight and secure 3 Proper length of the cable is reserved at the connectors 4 Proper length is reserved for the signal cables a...

Страница 15: ...er Control from the navigation tree choose Power On and click OK Powering Off the Server 2 Power off the server to the Standby state After power off all services and processes will be terminate Before powering off the server ensure that all services and processes have stopped or migrated to other devices During read and write operations over a hard disk do not turn off the external power supply or...

Страница 16: ...15 Changes in Documentation Updates in Issue 01 2015 12 30 This issue is the first official release ...

Страница 17: ...HUAWEI TECHNOLOGIES CO LTD Huawei Industrial Base Bantian Longgang Shenzhen 518129 People s Republic of China enterprise huawei com ...

Отзывы: