Figure 5-1
Flowchart for commissioning the MBTS in GL or UL mode on the M2000
NOTE
l
The priority of a mode does not need to be considered during the MBTS commissioning.
l
In the case of a dual-mode base station, you can consider the dual-mode base station as two single-
mode base stations. During the process of upgrading software and activating the data configuration
file, a large number of alarms may be generated because of configuration conflict. These alarms do not
need to be handled, because they will be cleared automatically after the software is upgraded and the
data configuration file is activated for base stations of each mode.
Procedure
Step 1
Create a commissioning task on the M2000. For details, see
Step 2
Optional:
If a GBTS is to be commissioned and
Intervening transmission
is selected when a
commissioning task is created, manually check the GBTS transmission state and rectify faults
(if any). For details, see
5.3 Intervening the GBTS Transmission
.
Step 3
The M2000 automatically commissions the MBTS. For details, see
. During the process of the MBTS commissioning, monitor the
commissioning progress and alarms, and rectify faults (if any). The monitoring operations vary
5 Commissioning the MBTS in GL or UL Mode on the
M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
5-4
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)