Figure 7-26
Board Management window
----End
7.4 Checking the Transmission Between the BBU and the
BSC on the BTS Side
This section describes how to check the status of the LEDs on the panels of the GTMU and
UTRP (if the UTRP is installed) and how to check the connections of the E1 cable and E1 surge
protection transfer cable to ensure that the BBU properly communicates with the BSC.
7 Commissioning the MBTS by Using Local Maintenance
Terminal and M2000
3900 Series Multi-Mode Base Station
Commissioning Guide
7-28
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Issue 02 (2010-07-30)