Figure 6-93
Fastening the body and back shell
Step 6
Push the heat-shrink tubing towards the connector, as shown in
. Then, heat the
tube.
Figure 6-94
Assembled N connector
Step 7
After the components are assembled, install the connector, as shown in
.
AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
6 Appendix
Issue 03 (2019-04-01)
Copyright © Huawei Technologies Co., Ltd.
102