background image

lp-752 Rev. 8.14.20

2

4.  Use a rubber mallet to aid in lifting the roof from the posts. See 

Figures 4 and 5.

NOTE: 

There are four (4) pins for ELX-400 - 500 and six (6) pins for ELX-

650 - 1000 securing the roof.

A

Figure 3 - Screws to be Removed / Loosened

5.  Remove the flow switch from the water supply manifold. See 

Figure 6.

Figure 4 - Removing the Roof

Figure 5 - Roof Removed from the Appliance

6.  Use the eyelets to hoist the unit. See Figure 7.

A

FLOW SWITCH

Figure 6 - Removing the Flow Switch from the Supply Manifold

Figure 7 - Hoist the Unit from the Eyelets

3.  Remove the seven (7) screws on the back of the unit (in red) and 

loosen the six (6) screws on the bottom of the water and gas 

flanges (in blue). See Figure 3.

NOTE:

 There are slots on the roof that allows the roof to be removed 

with these six (6) screws in place.

The boiler is heavy. At least two individuals and special 

equipment (pallet jack, forklift, hoist, etc.) are needed to properly 

handle the boiler. If surface flooring is rough, take care not to 

damage the boiler when moving it into position.

Отзывы: