Installation Instructions for Rack System
Main Rack Part # 7866P-017; Extension Rack Part # 7866P-018
272 Duchaine Blvd.
New Bedford, MA 02745
1(800) 323-9651
lp-674 Rev. 5.7.18
STOP! Follow these instructions or warranty will be void!
Installation Must Comply With:
1. The National Fuel Gas Code, ANSI Z223.1, latest edition
2. National Electrical Code
3. In Canada, CSA C22.1 Canadian Electrical Code Part 1, and
CGA No. B149 (latest version)
4. Local, state, provincial, and national codes, laws, regulations,
and ordinances.
This installation shall be done by a qualified service agency
in accordance with these instructions, the installation manual
included with the appliance to be mounted on this rack, all
applicable codes, and requirements of the authority having
jurisdiction. Failure to follow these instructions could result in
substantial property damage, severe personal injury, or death.
Included with Kit:
Description
Part Number
Quantity
Main Rack Extension Rack
Base Foot
7866P-001
2
1
Base Support
7866P-002
4
2
Angle Support
7866P-003
4
2
Vertical Post
7866P-004
2
1
Lower Beam
7866P-006
1
1
Upper Beam
7866P-007
1
1
End Cap
7866P-009
2
1
M10 Washer
7866P-010
44
24
M10 Hex Screw
7866P-011
22
12
M10 Hex Nut
7866P-012
22
12
M6 Self Tapping
Screw
7866P-013
12
6
M6 Hex Screw
7866P-014
2
2
M6 Hex Nut
7866P-015
2
2
M6 Washer
7866P-016
4
4
Instructions
LP-674
1
Tools Required (Not Included):
7mm and 10mm Ratchet, Socket Driver, or Wrench
Phillips Head Screwdriver
Rubber Mallet
Appropriate Drill with Assorted Bits
M10 or 7/16” Lag or Anchor Bolts and Washers for Anchoring
Rack into Wood or Concrete
Preparing for Installation:
Determine the best area to install the rack system. Ensure the
location meets building code requirements, and that all safety and
clearance requirements for the appliance(s) to be mounted to the
rack are met.
Installing the Rack System:
1. Move the rack components to the installation location. Ensure
you have all the components for the installation.
NOTE:
DO NOT lose these components. Replacements ARE NOT
included in this kit.
2. Set the base feet in the installation location. Verify finished
installation clearances will meet the service clearance requirements
of the appliance(s) to be mounted on the rack.
3. Use a Phillips Head Screwdriver and eight (8) screws to install
the four (4) angle supports to the two (2) base feet. See Figure 1.
NOTE:
DO NOT fully tighten the screws. Doing so will make it
difficult to install the vertical posts and waste time.
Remove all items from the packaging and ensure that all parts
and accessories are included in the kit. Any claims for damage
or shortage in shipment must be filed immediately against the
transportation company by the consignee.
Installer -
Read all instructions in this manual before installing.
Perform steps in the given order.
Obey all local codes. Obtain
all applicable permits before installing this rack system.
NOTE:
Install all components in such a manner that does not
reduce the performance of any fire rated assembly.
User -
These instructions are for use only by a qualified
heating installer / service technician.
FAILURE TO ADHERE TO THE GUIDELINES ON THIS
PAGE CAN RESULT IN SUBSTANTIAL PROPERTY
DAMAGE, SEVERE PERSONAL INJURY, OR DEATH.
Carefully consider installation when determining rack location.
Please read the entire appliance installation manual before
installing this rack. Failure to properly take factors such as
appliance venting, piping, condensate removal, and wiring into
account before installation could result in wasted time, money,
and possible property damage and personal injury.
Do not attempt to overtighten any of the bolts as this may damage
the threads and prevent the bolts from turning. Replacement
bolts are not included in this kit.
This rack system must be properly anchored and secured to the
floor BEFORE mounting appliances on it. Failure to follow these
instructions could result in substantial property damage, severe
personal injury, or death.