Lifter

Lift & Shift

A purpose built lift for raising

plasterboard panels into position

prior to fixing.

Operating & Safety Guide LS19

During use it is important that the operator
remains behind the winch assembly and the back
stop break leg is in contact with the floor. 

The back

stop will allow the unit to move away from the operator
but not backward toward him/her.
The lifter can be loaded in two ways, either with the
cradle flat or tilted.

To tilt the cradle lift the tilt lock up, then tilt the
cradle 

(approx 45 degs). Once loaded return the cradle

to horizontal and re-lock.

To raise the panel 

simply 

turn the winch clockwise

carefully manoeuvring the lifter until the panel is in the
correct position. You can then fix the panel in place.

To lower the cradle hold the winch to stop it rotating

then

raise the winch lock lever and turn the winch

anti-clockwise until the cradle is fully lowered.
If the panel is to be attached to a sloping ceiling,
the cradle can be set/left in the tilted position as
previously described.

Never push the equipment beyond its design
limits. 

If it will not safely do what you want with

reasonable ease and speed, assume you have the wrong
equipment for the job. Contact your local HSS Lift & shift
Depot for advice.

Keep the equipment clean,

you will find this less of a

chore if you clean it regularly, rather than wait until the
end of the hire period.
When not in use

, store the equipment somewhere

clean, dry and safe 

from thieves.

To

dismantle the lift, lock the cradle in the

horizontal position, reinsert the end supports and
remove the cross supports, 

remembering to press in

the  spring loaded retainers.

FINISHING OFF

EQUIPMENT CARE

BASIC TECHNIQUES

The cradle can now be lifted clear.

Now

rotate the winch one full rotation 

then

raise

the slide bar with your left hand whilst turning the
slide bar lock anti-clockwise. 

Next

push down on the top of the telescopic

section allowing the winch assembly to move
forward. Hold the assembly in position and swing
the transport hook over the telescopic section to
lock it in position.

All that remains is to

turn the

winch clockwise as far as it will go.
Lift the frame off of the tripod base 

then

collapse

the tripod base assembly. 

Press in the lock pin and

swing the outer legs in until the lock pin re-engages to
hold the assembly closed.

Collect all the units parts together ready for return

to your local HSS Lift & Shift Depot.

Code 69940

©HSS Hire Service Group Plc 1998 No. LS19/01

Group Office: 25 Willow Lane, Mitcham, Surrey CR4 4TS

Web Site: http://www.hss.co.uk

Contact your local

0345 045116

Lift & Shift

…any comments?

If you have any suggestions to enable us to improve

the information within this guide please fax your

comments or write to the Product Manager at the

address below  

Fax: 0181-687 5001

Tilt Lock

Tilting the Cradle