5.10 General post-installation checks
Verify the correct wiring before start-up.
Check that the unused connectors are adequately plugged.
Check that the plastic dipswitch access window is properly closed. If the window is not
present, the equipment IP degree gets compromised.
5.11 Running-in
The products, before being packaged, undergo an automatic running-in cycle to guarantee the
correct distribution of the lubricant in the races of the bearings. The running-in cycle also includes
a detailed check of all the control and signalling devices through the simulation of various
machining cycles on the test-bench. The customer must not launch any additional running-in
procedure.
5.12 Environmental conditions
The manufacturer has inspected and tested its products under standard environmental conditions
(refer to paragraph
for a detailed description).
Contact HSD S.p.A. for information about the possibility of applications for special environments.
Содержание CPH 400 B
Страница 2: ......
Страница 4: ...Information about the publication 4 HSD S p A H5834D0175 fm091115 ...
Страница 8: ...Table of contents 8 HSD S p A H5834D0175TOC fm091115 ...
Страница 9: ...Preliminaries ...
Страница 10: ......
Страница 16: ...1 Preliminary information 16 HSD S p A h0101k00a fm091115 ...
Страница 20: ...2 Safety information 20 HSD S p A h0115k00a fm091115 ...
Страница 21: ...Description ...
Страница 22: ......
Страница 50: ...5 Installation and commissioning 50 HSD S p A h0104k02a fm091115 ...
Страница 51: ...Maintenance ...
Страница 52: ......
Страница 54: ...6 Maintenance 54 HSD S p A h0107k00a fm091115 ...
Страница 55: ...Appendices ...
Страница 56: ......
Страница 62: ...A Technical characteristics 62 HSD S p A h0124k00a fm091115 ...
Страница 64: ...B Disposal 64 HSD S p A h0109k00a fm091115 ...
Страница 66: ...C Spare parts 66 HSD S p A h0111k00a fm091115 ...
Страница 73: ......