Figure 15: Securing the switch (HPE 10000 Series Rack)
3.
Tighten the hex nuts installed in step
on page 29.
4.
Verify that the switch power and status LEDs on the port side of the switch are green. See
on page 32.
1. System power LED
2. System status LED
3. FC port status LED (port 0)
4. FC port status LED (port 4)
5. Ethernet port activity LED
6. Ethernet port speed LED
Figure 16: LEDs on port side
5.
For switches with Port Side Air Intake, proceed to
on page 43.
This completes the rack mount procedure.
Installing the HPE SN6000B 16Gb FC and HPE SN3000B 16Gb FC switches
in a rack using the Rack Mount Kit
Use the SN6000B and the SN3000B Switch Rack Mount Kits to install the switch in an 10000 Series
Rack.
32
Installing the HPE SN6000B 16Gb FC and HPE SN3000B 16Gb FC switches in a rack using the Rack