Chapter 6: Power supply maintenance
31
8.
Connect and secure the power cable to the new power supply and to the power source.
9.
Ensure that the power cables are fully inserted at both ends.
10.
Power up the servers.
11.
Examine the LEDs and event messages to ensure the power supply is operational.