This method initiates a controlled shutdown of applications and the OS before the server enters
standby mode.
• Press and hold the Power On/Standby button for more than 4 seconds to force the server to enter
standby mode.
This method forces the server to enter standby mode without properly exiting applications and the
OS. If an application stops responding, you can use this method to force a shutdown.
• Use a virtual power button selection through iLO.
This method initiates a controlled remote shutdown of applications and the OS before the server
enters standby mode.
3.
Verify that the server is in standby mode by observing that the system power LED is amber.
Extending the server from the rack
To perform this procedure, you will need a T-25 screwdriver.
NOTE:
If the optional cable management arm option is installed, you can extend the server without
powering down the server or disconnecting peripheral cables and power cords. These steps are only
necessary with the standard cable management solution.
WARNING:
To reduce the risk of personal injury or equipment damage, be sure that the rack is
adequately stabilized before extending a component from the rack.
WARNING:
To reduce the risk of personal injury, be careful when pressing the server rail-release
latches and sliding the server into the rack. The sliding rails could pinch your fingers.
Procedure
1.
If installed,
.
3.
Disconnect all peripheral cables and power cords.
4.
Do the following:
a.
Open the latches on both sides of the server.
b.
If necessary, use a T-25 Torx screwdriver to loosen the shipping screws.
c.
Slide the server out of the rack.
Removal and replacement procedures
31
Содержание ProLiant DL325
Страница 13: ...Customer self repair 13 ...
Страница 14: ...14 Customer self repair ...
Страница 15: ...Customer self repair 15 ...
Страница 16: ...16 Customer self repair ...
Страница 51: ... Slot 2 Slot 3 To replace the component reverse the removal procedure Removal and replacement procedures 51 ...
Страница 57: ... SFF a Remove the optical drive cage b Remove the optical drive Removal and replacement procedures 57 ...
Страница 62: ...10 Remove the iLO service port assembly 11 Remove the front I O module 62 Removal and replacement procedures ...
Страница 116: ... 4LFF drive connected to type a controller 4LFF drive connected to type p controller Slot 1 116 Cabling ...
Страница 117: ... Slot 2 Slot 3 Cabling 117 ...
Страница 120: ... Slot 2 Slot 3 120 Cabling ...
Страница 126: ...Cable routing Power supply Non hot plug power supply Power distribution board PDB to system board 126 Cabling ...
Страница 128: ...Item Description Orange Front I O cable Blue Ambient temperature sensor cable Cable routing USB 3 0 LFF SFF 128 Cabling ...
Страница 129: ...Cable routing Serial port Cabling 129 ...
Страница 130: ...Cable routing Chassis Intrusion Detection switch Cable routing M 2 SSD Slot 1 Slot 2 130 Cabling ...
Страница 132: ... Slot 2 Slot 3 132 Cabling ...
Страница 133: ...Cable routing Energy pack Cabling 133 ...