8.
9.
10. Install the server into the rack.
11. Connect all peripheral cables to the server.
12. Connect each power cord to the server.
13. Connect each power cord to the power source.
15. Configure the storage controller.
16. If removed, install the bezel.
The installation is complete.
Installing a Smart Array PCIe plug-in controller
NOTE: A Smart Array PCIe plug-in controller is supported in slot 2 and slot 3 only due to cabling limitation.
NOTE: If the slimline primary riser is installed, the controller is not supported in slot 2.
NOTE: If the slimline secondary riser is installed, the controller is not supported in slot 3.
Prerequisites
• Before you perform this procedure, make sure that you have the following items available:
◦
Smart Array PCIe plug-in controller option
◦
Compatible controller cable option
◦
T-15 Torx screwdriver
◦
Phillips No. 1 screwdriver
• If you are installing a Smart Array P-class Gen10 controller,
an energy pack option is required.
Hardware options installation
81
Содержание ProLiant DL325 Gen10 Plus
Страница 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Страница 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Страница 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Страница 52: ...52 Operations...
Страница 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Страница 119: ...SFF Cable routing Front I O LFF Cabling 119...
Страница 120: ...SFF Cable routing Serial port 120 Cabling...
Страница 122: ...Cable routing Energy pack 122 Cabling...