Installation 12
8.
Install the controller or adapter.
9.
Install the front panel/drive cage assembly.
10.
Install all drives.
11.
Install all drive blanks.
12.
Install the access panel.
13.
Install the compute module.
Installing the Smart Array P542D with HPE Synergy
Smart Array P542D Controller installation guidelines
•
Make sure that mezzanine cards are installed in server mezzanine slots that map to the selected
Synergy frame interconnect bay.
•
For the Synergy 480 compute module, it must occupy mezzanine slot 1.
•
For the Synergy 660 compute module, it must occupy mezzanine slot 1 or mezzanine slot 4.
IMPORTANT:
For more information about the association between the mezzanine bay and
the interconnect bays, see the
HPE Synergy 12000 Frame Setup and Installation Guide
in the
Hewlett Packard Enterprise Information Library
http://www.hpe.com/info/synergy-docs
).
Where you install the mezzanine card determines where you need to install the interconnect
modules.
Installing Smart Array P542D Controller
1.
Place the compute module on a flat, level work surface.
2.
Remove the access panel.
3.
Locate the appropriate mezzanine connector. To locate the connector, see "P542D controller
components (on page
)."
4.
Remove the mezzanine connector cover, if installed.
5.
Install the mezzanine card. Press firmly on the
PRESS HERE
label above the mezzanine connector
to seat the card.