8
two mounting positions: one front mounting position (near the network ports) and one rear mounting
position (near the power supplies).
The HPE 5130 48G PoE+ 4SFP+ (370W) EI, HPE 5130 48G PoE+ 4SFP+ (370W) EI BR, HPE 5130
24G PoE+ 2SFP+ 2XGT (370W) EI, HPE 5130 48G PoE+ 2SFP+ 2XGT (370W) EI, and HPE 5130
24G SFP 4SFP+ EI switches provide three mounting positions: one front mounting position (near the
network ports), one mid-mounting position, and one rear mounting position (near the power
supplies).
To attach the mounting brackets to the switch:
1.
Determine the mounting position.
2.
Align one mounting bracket with the screw holes at the mounting position. Use M4 screws
provided with the switch to attach the mounting bracket to the chassis.
3.
Repeat step
to attach the other mounting bracket to the chassis.
Figure 4 Attaching a two-hole mounting bracket to the front mounting position on an HPE
5130 24G 4SFP+ EI switch
Figure 5 Attaching a two-hole mounting bracket to the rear mounting position on an HPE
5130 24G 4SFP+ EI switch
Figure 6 Attaching a four-hole mounting bracket to the front mounting position on an HPE
5130 24G SFP 4SFP+ EI switch