8/18/2020
HPE FlexFabric 5710 Switch Series - Installing the Switch
4/7
Item
Description
1
Mounting bracket installation position near the power supply side
2
Primary grounding point
3
Auxiliary grounding point
4
Mounting bracket installation position near the port side
top
Mounting bracket installation positions and grounding positions on an HPE5710-54HT switch
Item
Description
1
Mounting bracket installation position near the power supply side
2
Primary grounding point
3
Auxiliary grounding point
4
Mounting bracket installation position near the port side
top
Attaching the mounting brackets and chassis rails to the chassis
The mounting bracket and chassis rail installation methods are the same for the HPE 5710-54HFand HPE 5710-30HF switches.
To attach the mounting brackets and chassis rails to the chassis:
1. Align the mounting brackets with the screw holes in the chassis. Use M4 screws (provided) toattach the mounting brackets to the
chassis.
Install the mounting brackets at the port side.
Install the mounting brackets at the power supply side.
2. Align the chassis rails with the rail mounting holes in the chassis:
If the mounting brackets are in the port-side mounting position, align the chassis rails withthe screw holes at the rear of the
side panels.
If the mounting brackets are in the power supply-side mounting position, align the chassisrails with the screw holes at the front
of the side panels.