HPC MVK-EIMC Series Скачать руководство пользователя страница 2

Parts List: 

 

 

 

 

 

 

 

 

 115 

 Pilot 

Assembly 

(1) 

 

210-EI       

Gas Valve (1) 

 210-EI-Mod 

Module 

(1) 

 212 

 Switch 

(1) 

 213 

 Wires 

for 

switch 

(1) 

 

256/241 

Heat Shield / Insulation for valve (1) 

 

270/271 

Heat Shield / Insulation for module (1) 

274

 

Female Connector (12) 

 279 

 Ground 

Connector 

(1) 

 576-40VA 

Transformer 

(24V) 

 579 

 Power 

Cord 

(1) 

 616 

 High 

Temp 

Wire 

(8) 

617  

Wire 

Nut 

(6) 

649  

Pilot 

Tube 

(1) 

 

 SSC-HC24 

Flex 

Line 

(2) 

 

 

CHECKOUT__________________________________

  Check out the gas control system: 

   

y

  At initial installation of the appliance. 

   

y

  As part of regular maintenance procedures.  Mainte- 

       nance intervals are determined by the application. 

   

y

  As the first step in troubleshooting. 

   

y

  Any time work is done on the system. 

 

 Perform Visual Inspection

…

 With power off, make sure all wiring connections 

are clean and tight. 

…

 Turn on power to appliance and ignition module. 

…

 Open manual shutoff valves in the gas line to the 

appliance. 

…

 Do gas leak test ahead of gas control if piping has 

been disturbed. 

  

GAS LEAK TEST: Paint pipe joints with rich soap and 
water solution. Bubbles indicate gas leak.  Tighten 

joints to stop leak. Recheck with soap and water. 

Check Safety Shutoff Operation 
This step applies to lockout and continuous retry 

modules only. 

…

 Turn gas supply off. 

…

 Set thermostat or controller above room 

temperature to call for heat. 

…

 Watch for spark at pilot burner either immediately 

or following pre-purge. See device label. 

…

 Open manual gas cock and make sure no gas is 

flowing to pilot or main burner. 

 
 

O

 

 
 

 

 
 

 
 

 

 
 
 

 
 

 

 
 

PERATION__     

Module operation can be divided into two phases for 
the S8600.  The phases are 

  

y

 Trial for ignition  

  

y

 Main burner operation 

 

TRIAL FOR IGNITION 

Pilot Ignition 
   On the call for heat, the module energizes the first 

main valve operator.  The first main valve opens, which 

allows gas to flow to the pilot burner.  At the same time, 
the electronic spark generator in the module produces 

an over 10k volt spark pulse output.  The voltage 

generates a spark at the igniter or igniter-sensor that 
lights the pilot. 

   If the pilot does not light, or the pilot flame current is 

not at least 1.0 A and steady, the module will not 
energize the second valve and the main burner will not 

light.   

 
MAIN BURNER OPERATION 

  When the pilot flame is established, a flame 

rectification circuit is completed between the sensor 
and burner ground.  The flame sensing circuit in the 

module detects the flame current, shuts off the spark 
generator and energizes the second main valve 

operator.  The second main valve opens and gas flows 

to the main burner, where it is ignited by the pilot burner.  
On lockout models, the flame current also holds the 

safety lockout timer in the reset operating condition. 

   When the call for heat ends, both valve operators are 
de-energized, and both valves in the gas control close. 

 

 

 
 

 

 
 

 

 
 

               

Safety Lockout 

  These modules provide 100 percent 
shutoff and safety lockout.  A timer in these 

models starts timing the moment the trial 

for ignition starts. Ignition spark continues 
only until the timed trial for ignition period 

ends.  Then the module goes into safety 

lockout.  Lockout de-energizes the first 
main valve operator and closes the first 

valve in the gas control, stopping pilot gas 

flow.  The control system must be reset by 
setting the thermostat below room 

temperature for one minute or by turning 

off power to the module for one minute. 

 
 

f i r e - p a r t s . c o m

Отзывы: