Prerequisites
Tools required
• 2 small flathead screwdrivers or Torx drivers
• #2 Phillips screwdriver
Procedure
3. Prepare to remove the robotic assembly and spooling mechanism from the base module
4. Remove the robotic assembly and spooling mechanism from the base module
5. Install the robotic assembly and spooling mechanism into the base module
6. Completing the robotic assembly and spooling mechanism installation
8. Verify the replacement procedure
Powering off the library
IMPORTANT:
When the library is powered off using the front power button, the robot automatically parks and locks
into the base module behind the OCP.
After powering off the library and before extending the module from the rack, look through the
expansion module windows to locate the robotic assembly. Verify that it is behind the OCP, with
approximately three rows of tape cartridges visible below the robot.
Depending on expansion module placement, you might need to remove a magazine from the base
module to determine the robot position.
If you do not see the robotic assembly completely in the base module, see the instructions for
returning the robotic assembly to the base module in the troubleshooting chapter.
Procedure
1.
Verify that all host processes are idle.
2.
Depress the power button on the front panel for 5 seconds and then release it.
If the library is idle, you can release the button when the Ready LED begins flashing.
If the library does not perform a soft shutdown, press and hold the power button for 10 seconds.
3.
If the library has multiple modules, verify that the robotic assembly is in its parked position behind the
OCP.
IMPORTANT:
Continuing this procedure when the robotic assembly is not in its parked position could damage
library components.
152
Powering off the library