Beyond Initial Setup
52
NAS e7000 v2 Quick Start Guide
Cluster Installation
Installation Overview
During the installation process, both nodes will be shut down and both nodes will
be rebooted. These steps are necessary to guarantee that the data on disks that are
attached to the shared storage bus is not lost or corrupted. This can happen when
multiple nodes try to simultaneously write to the same disk that is not yet
protected by the cluster software.
Use
to determine which nodes and storage devices should be presented
during each step.
To configure the Cluster service on the HP StorageWorks NAS server, the account
must have administrative permissions on each node. Both nodes must be member
servers within the same domain.
Table 4: Power Sequencing for Cluster Installation
Step
Node
1
Node
2
Storage
Comments
Setting up
networks
On
On
Not
presented
Verify that all storage devices on
the shared bus are not presented.
Power on both nodes.
Setting up
shared disks
On
Off
Presented
Shut down both nodes. Present the
shared storage, and then power
on the first node.
Verifying Disk
Configuration
Off
On
Presented
Shut down first node, power on
second node.
Configuring the
First Node
On
Off
Presented
Shutdown all nodes; power on the
first node.
Configuring the
Second Node
On
On
Presented
Power on the second node after
the first node was successfully
configured.
Post-installation
On
On
Presented
At this point all nodes should be
on.
Содержание StorageWorks NAS e7000 v2
Страница 6: ...Contents 6 NAS e7000 v2 Quick Start Guide ...
Страница 41: ...Configuration Setup 41 NAS e7000 v2 Quick Start Guide Figure 9 Rapid startup wizard screen ...
Страница 46: ...Configuration Setup 46 NAS e7000 v2 Quick Start Guide ...
Страница 70: ...Index 70 NAS e7000 v2 Quick Start Guide ...