Diagnostics
129
2. Ensure the Enable Switch Binding checkbox is enabled (checked) for both
directors.
3. Ensure the Connection Policy radio buttons are compatible for both directors.
4. Click Activate for each director or switch. The switch binding feature is
consistently enabled for both directors or switches.
Did configuring the switch binding parameters solve the problem?
NO
YES
↓
The director is operational. Exit MAP.
Contact the next level of support. Exit MAP.
29
A port connection is not allowed because of a fabric binding mismatch. Fabric
membership lists must be compatible for both fabric elements.
1. At the HAFM main window, choose Configure > Fabric Binding. The
Fabric Binding dialog box, as shown in
.
Figure 31: Fabric Binding dialog box
2. At the Fabric List section, ensure the Enable/Disable checkbox is enabled
(checked) for the fabric containing both directors or switches.
Содержание StorageWorks 2/140 - Director Switch
Страница 18: ...About this Guide 18 Director 2 140 Service Manual ...
Страница 160: ...Diagnostics 160 Director 2 140 Service Manual ...
Страница 224: ...FRU Removal and Replacement 224 Director 2 140 Service Manual Figure 72 ESD grounding points 1 ...
Страница 262: ...FRU Removal and Replacement 262 Director 2 140 Service Manual ...
Страница 270: ...Illustrated Parts Breakdown 270 Director 2 140 Service Manual ...
Страница 318: ...Information and Error Messages 318 Error Messages ...
Страница 388: ...Event Code Tables 388 Director 2 140 Service Manual ...