5.
Install the switch. See
Figure 7 (page 16)
.
a.
From the front of the rack, slide the switch (with inner rails attached) onto the outer rails,
taking care to align the inner rails with the attachment screws on the outer rails at the
rear of the rack.
b.
When the switch is in place, secure the inner rails to the outer rails by tightening the
screws at the rear of the rack.
Figure 7 Installing the switch in the rack
6.
At the front of the rack, run the switch power cords from the sides of the rack through the
cutouts in the rail, and then connect them to the switch power supplies. See
Figure 8 (page
16)
.
CAUTION:
Ensure that the power cords do not come in contact with any sharp edges.
Figure 8 Connecting power and installing the plenum
3. Power switches
1. Cutouts for power cords
4. Plenum
2. Power cable plugs
16
HP SN6000B 16Gb FC Switch installation and configuration
Содержание SN6000B
Страница 48: ...French laser notice German laser notice Italian laser notice 48 Regulatory compliance notices ...
Страница 54: ...French battery notice German battery notice 54 Regulatory compliance notices ...
Страница 55: ...Italian battery notice Japanese battery notice Battery replacement notices 55 ...
Страница 56: ...Spanish battery notice 56 Regulatory compliance notices ...
Страница 59: ...WWN World Wide Name 59 ...